Cont. – Ice Pigging Schedule
FRI, MAY 30 RUN REF NAME INSERTION POINT DISCHARGE POINT Highland Dr / Dunbar Ct. & Highland Greens Highland Dr Hyd 98 Dubar Ct. B/O Highland Greens B/O Highland Dr Highl [...]
FRI, MAY 30 RUN REF NAME INSERTION POINT DISCHARGE POINT Highland Dr / Dunbar Ct. & Highland Greens Highland Dr Hyd 98 Dubar Ct. B/O Highland Greens B/O Highland Dr Highl [...]
The move to the South side of Port Ludlow has been delayed as maintenance of the ice production equipment is currently being performed. Pigging will continue as soon as ice p [...]
The scheduled North Bay ice pigging has been completed. Additional areas may be addressed after completion of the rest of the schedule. May 17-23 {South PL} » DAY 1 - MON, M [...]
OLYMPIC WATER AND SEWER INC. WATER RATE INCREASE REQUEST On 12/30/24, OWSI filed with the Washington Utilities and Transportation Commission (WUTC) for a general rate case. Th [...]
Olympic Water & Sewer will be holding two community town halls to share information and answer questions about the upcoming Ice Pigging project, scheduled to begin in May. [...]
The flushing plan for the week of 03/24/2025 is to work through the Villages and Streets listed below. Gull Dr, Heron Rd, Cascade Pl, Hood Way, Olympic Way, Olympic Pl, Pope [...]
The flushing plan for the week of 03/17/2025 is to work through the Villages and Streets listed below. Edgewood Dr, Timberton Dr, Timber Heights Dr, Vistawood Ct, Heritage Ln [...]
The flushing plan for the week of 03/10/2025 is to work through the Villages and Streets listed below. Highland Dr, Deer Hollow Rd, Deer Hollow Cir, Dunsmuir Rd, Fernridge Ln [...]
UPDATE 2/28/25: The Washington Utilities and Transportation Commission (UTC) has granted Olympic Water & Sewer a partial exemption from WAC 480-110-375, which mandates [...]
Olympic Water and Sewer will be conducting water main flushing in the South Bay service area starting March 4, 2025 and will continue until completed. This is not a continu [...]